The construction of the holding tanks for drainage in Zone A near the beach at Mirador San Jose, continues to progress to completion. The workers have been busy constructing the large holding tanks to catch water flowing from Zones A, B and C. The water that is collected in the holding tanks will be directed by large plastic pipes that will direct the flow of water to drain into the sea.
The large plastic pipes seen here among the first to be delivered and installed throughout the property used for the drainage of water at Mirador San Jose.